ERT weekly construction schedule for October 14 to October 21

elizabeth river tunnels

HAMPTON ROADS, Va. (WAVY) – The following is Elizabeth River Tunnels weekly schedule for tunnel/lane closures that may affect regular traffic in Hampton Roads. Due to the nature of construction, closure dates are subject to change. Visit the Travel Impacts page for current information.

Downtown Tunnel

  • I-264 West: Downtown Tunnel open with a single lane closure Monday through Thursday Oct. 17-20 from 8 p.m. each night until 5 a.m. the following morning.

Midtown Tunnel

  • U.S. 58 East: Full weekend tunnel closure from Friday, Oct. 14 at 8 p.m. through Monday, Oct. 17 at 5 a.m.
  • U.S. 58 East: Midtown Tunnel open with a single lane closure Monday through Thursday, Oct. 17-20 from 8 p.m. each night until 5 a.m. the following morning.
  • VA 164 East/West: Inside lane closures near Port Norfolk exit Wednesday through Friday, Oct. 19-21 from 9 a.m. until 3 p.m. each day.

MLK Freeway

  • High Street: Alternating lane closures in both directions Friday through Friday, Oct. 14-21 from 5 a.m. to 7 p.m. each day.
  • London Boulevard East/ U.S. 58: Full ramp closure from Friday, Oct. 14 at 8 p.m. through Monday, Oct. 17 at 5 a.m. The ramp will then be closed Monday through Thursday, Oct. 17-20 from 8 p.m. each night until 5 a.m. the following morning.
  • U.S. 58/ London Boulevard East: Full ramp closure Monday through Friday, Oct. 17-21 from 8 p.m. each night until 5 a.m. the following morning.
  • Frederick Boulevard North/I-264 East: Full ramp closure Monday and Tuesday, Oct. 17 and 18 from 9 p.m. each night until 5 a.m. the following morning.
  • I-264 East: Lane closures between Effingham Street and Portsmouth Boulevard Monday through Friday, Oct. 17-21 from 9 p.m. each night until 5 a.m. the following morning.
  • I-264 West: Lane closures between Effingham Street and Portsmouth Boulevard Monday and Tuesday, Oct. 17 and 18 from 9 p.m. each night until 5 a.m. the following morning.

The Virginia Department of Transportation (VDOT) encourages motorists to “Know Before You Go” and plan your trip with free tools:

  •  Download the 511 smartphone app
  •  Visit the 511 Virginia website or dial 511 for traffic information on your phone
  •  Listen to Highway Advisory Radio (HAR) 1680AM
  •  Call the Traffic Line at 757-361-3016