ERT weekly construction schedule for September 30 to October 7

HAMPTON ROADS, Va. (WAVY) – The following is Elizabeth River Tunnels weekly schedule for tunnel/lane closures that may affect regular traffic in Hampton Roads. Due to the nature of construction, closure dates are subject to change. Visit the Travel Impacts page for current information.

Downtown Tunnel

  • I-264 West: Downtown Tunnel open with a single lane closure Friday and Saturday, Sept. 30-Oct. 1 from 8 p.m. each night until 8 a.m. the following morning, and Sunday, Oct. 2 from 8 p.m. until 5 a.m. the following morning.
  • I-264 East/West: Downtown Tunnel open with a mobile lane closure Sunday, Oct. 2 from 5 a.m. to 11 a.m.

Midtown Tunnel

  • U.S. 58 East: Full weekend tunnel closure from Friday, Sept. 30 at 8 p.m. through Monday, Oct. 3 at 5 a.m.
  • U.S. 58 East: Midtown Tunnel open with a single lane closure Monday through Thursday, Oct. 3-6 from 9:30 a.m. until 5 a.m. the following morning.

MLK Freeway

  • London Boulevard East/ U.S. 58: Full ramp closure from Friday, Sept. 30 at 8 p.m. through Monday, Oct. 3 at 5 a.m.
  • U.S. 58/ London Boulevard East: Full ramp closure Monday through Thursday, Sept. 26-29 from 7 p.m. each night until 5 a.m. the following morning.
  • High Street: Full closure between Constitution Avenue and Confederate Avenue Saturday, Oct. 1 from 5 a.m. to Sunday, Oct. 2 at noon.
  • I-264 East: Lane closures between Frederick Boulevard and Effingham Street Sunday through Thursday, Oct. 2-6 from 8 p.m. until 5 a.m. the following morning.
  • I-264 East/West: Lane closures between Effingham Street and Frederick Boulevard Monday through Thursday, Oct. 3-6 from 9 p.m. each night until 5 a.m. the following morning.

The Virginia Department of Transportation (VDOT) encourages motorists to “Know Before You Go” and plan your trip with free tools:

  •  Download the 511 smartphone app
  •  Visit the 511 Virginia website or dial 511 for traffic information on your phone
  •  Listen to Highway Advisory Radio (HAR) 1680AM
  •  Call the Traffic Line at 757-361-3016