High winds force ERT to postpone sign installation

elizabeth river tunnels

PORTSMOUTH, Va. (WAVY) — High winds have forced Elizabeth River Tunnels crews to postpone sign installation on Interstate 464.

The work was originally scheduled to be done overnight Thursday on I-464 northbound at Exit 6 (State Street) and I-464 northbound at Exit 5 (S. Main Street).

ERT said the sign installation will be rescheduled for a later date.

blog comments powered by Disqus